P1
: Nitrous at Balls in '08
Airframe Project
Last Update, 6/24/07 by Stephen Daniel
Design
Design notes are linked here.
Status
Construction notes for the payload bay are here
.
Nose cones on order.
Basic design of the airframe done. Still open:
Length of the lower airframe tube
Fin shape and size
Next steps are to buy fabric and to begin building tubes.
Budget
High level budget is $300.
Spent $70 on nose cones.
Spent $70 on PML tubing.